{"id":5091,"date":"2025-04-09T13:28:05","date_gmt":"2025-04-09T11:28:05","guid":{"rendered":"https:\/\/www.bessac.com\/?page_id=5091"},"modified":"2026-02-18T16:38:01","modified_gmt":"2026-02-18T15:38:01","slug":"history","status":"publish","type":"page","link":"https:\/\/www.bessac.com\/en\/about-us\/history\/","title":{"rendered":"History"},"content":{"rendered":"
For over 50 years, we’ve gained <\/span>unparalleled experience<\/strong> in both <\/span>tunnel and microtunnel construction<\/strong>, as well as the <\/span>design and manufacturing <\/strong>specialized equipment for underground works.<\/b><\/span><\/p>\n<\/div> In this section<\/b><\/span><\/p>\n<\/div> . <\/b><\/span>BESSAC’s Strengths<\/b><\/span><\/a>
\n . <\/b><\/span><\/a>Our history<\/a><\/b><\/span><\/p>\n<\/div>BESSAC’s Strengths<\/b><\/h2><\/div><\/div><\/div>
<\/span><\/div>Highly specialized teams, able to mobilize and respond quickly<\/h5><\/div><\/div><\/div>
<\/span><\/div>A fleet of more than 40 TBMs and MicroTBMs<\/h5><\/div><\/div><\/div>
<\/span><\/div>Strong capacity for innovation<\/h5><\/div><\/div><\/div><\/div><\/div><\/div>
Our history<\/span><\/span><\/h2><\/div><\/div><\/div><\/div><\/div>
2025<\/span><\/strong><\/h3><\/div><\/div><\/div>
France\u2019s longest microtunnel record at 1,355 m for the France\/Spain Electrical Interconnection<\/h5><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>2023<\/span><\/span><\/strong><\/h3><\/div><\/div><\/div>
World first: Very low-carbon metakaolin concrete tunnel for Toulouse Metro Line B Connection<\/h5><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>20<\/span>21<\/strong><\/h3><\/div><\/div><\/div>
World first: Ultra-low carbon concrete microtunnel for the Bonneuil-en-France wastewater treatment plant discharge<\/h5><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>2019<\/span><\/span><\/strong><\/h3><\/div><\/div><\/div>
France’s record for the largest pipe jacking, with an internal diameter of 3.5m, for a water transfer gallery at the Clichy wastewater treatment plant<\/h5><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>2018<\/span><\/strong><\/h3><\/div><\/div><\/div>
Construction of our new headquarters<\/h5><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>20<\/span>17<\/strong><\/h3><\/div><\/div><\/div>
French record for the tightest curve (R=110m) achieved with a microtunnelling machine for the Livry-Gargan wastewater collector<\/h5><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>2015<\/span><\/strong><\/h3><\/div><\/div><\/div>
World first: Implementation of a hydrid tunnel boring machine allowing a switch from pipe jacking to segment lining for the Miami Norris Cut wastewater collector<\/h5><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>20<\/span>13<\/strong><\/h3><\/div><\/div><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>20<\/span>09<\/strong><\/h3><\/div><\/div><\/div>